Changeover type
Task durations (minutes)
Defaults are based on industry averages. Adjust to match your actual line.
Production context
Results — changeover estimate
Total changeover
—min
Lost production
—units
Total cost
€—
| Task | Duration (min) | % of total |
|---|
SMED analysis
Changeover time is measured from last good part of the previous run to first good part of the new run meeting quality standards. Based on SMED methodology (Shigeo Shingo, 1985). Cost calculations are indicative only.